Killara Public School required new buildings to accommodate growing student numbers, however, disruption to school activities had to be minimised during the construction phase.
EPB designed separate five classroom, library and special programs buildings using prefabricated, modular construction methods. All buildings were able to be delivered and installed during the holidays ensuring minimal disruption to the school where safety of children and staff was imperative.
This project included substantial face brick work to integrate the new buildings into the existing built environment.