Westmead Hospital required a new purpose-built trauma centre to be located in a designated location within the hospital grounds and fully operational within a short time frame.
EPB designed the building to efficiently utilise the allocated space and expedited manufacture, delivery and installation to meet the tight time frame.
In addition, on site works was scheduled to ensure minimal disruption and the fast tracking of building installations meant the building was ready for occupancy just seven days from delivery of modules.